In the next few days (we hope) or maybe over the next couple of weeks the Malak Campus will get a face lift on the outside of the building.
Firstly from the street you will be able to see the church. We are cleaning up a lot of the trees from the front of the building. 2 reasons. One is that there are a few that are termite ridden and need to be chopped down for safety issues. Second reason is that we want to be able to open up the aspect of the church so it can be seen from the street.
The church building will also be painted as it is looking tired. It was painted over 6 years ago and the Territory weather conditions have taken their toll on it. The colour will be similar to the colourbond panels that that are on both the front and the rear of the building.
The pics to come soon will be the BEFORE pics and in a few weeks we hope to post the AFTER pics ...
Always HOPE!